Skip to content

KPIs for Engineering

We are firm believers of measuring successes and failures. And most times, what gets measured and communicated will improve over time.

At DoubleGDP, we measure a few data points over time to make sure we can consistently improve and spot trouble some trends before becoming unruly. Some data points are measured constantly, and a overall data summary is compiled at the end of every week.

At the beginning of the sprint, two or more engineers assign each story a certain number of points (days of work). Bugs automatically have 1 point (1 day's worth of work). The total number of points in a sprint should be around 10 * total engineers. 10 * total number of engineers is the minimum point number engineers are expected to complete cumulatively.